/
/
/
/
/
/
/
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
ALL
ALL
ALL
ALL
Antonio Chicaia
Alex GardnerBen
Kopp Berkle Kirsche
Bobby Engvall Blair
AlleyBrett GiffordB
Thom Stevenson
Cabagges World
Cara Friedman
Carlos Jaramillo
Casper KentCole
Barash Chad
Moore Chandler
Bondurant Chris
Black Christopher
Chang Chris
Glickman Tom
Christopher Bu
Petrus Hsu
Jake Fine
Carlos Jaramillo
Casper KentCole
Barash Chad
Moore Chandler
Bondurant Chris
Black Christopher
Chang Chris
Glickman Tom
Christopher Bu
Petrus Hsu
Jake Fine
CONRAC at LAX
CONRAC at LAX
BUILDINGS
All
2018
WIN / RATIO collaborated with an internal team to provide proposal services, including section management and technical writing, on the bid to design, build, finance, and operate and maintain the car rental facility at the Los Angeles Airport.
X
Energy Services Acquisition Program
Energy Services Acquisition Program
CLIMATE
All
2018
WIN / RATIO provided a five-person team to provide end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, on a bid to modernize the heating and cooling systems serving 80 federal government buildings in Ottawa. Location: Ottawa | Size: $2.6 billion
X
Hazel McCallion Light Rail
Hazel McCallion Light Rail
TRANSIT
All
2019
WIN / RATIO's five-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, on a bid to design, build, finance, operate and maintain light rail in the Greater Toronto Area. Location: Toronto | Size: $4.6 billion | Outcome: Won
X
CA High Speed Rail
CA High Speed Rail
RAIL
All
2020
WIN / RATIO's eight-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production on a bid for the track and services package of the California High Speed Rail project.
X
Sepulveda Transit Corridor
Sepulveda Transit Corridor
TRANSIT
All
2020
WIN / RATIO's three-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, on a bid to to enter into a pre-development agreement with LA Metro for a new transit line in Los Angeles. Outcome: Won CDA phase
X
Scarborough Subway Tunnel
Scarborough Subway Tunnel
TRANSIT
All
2020
WIN / RATIO supported the proponent team in both the qualification and proposal phase for bid to design, finance, and build the advance tunnel for a subway extension in Toronto Ontario. At the proposal phase, WIN / RATIO's six-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production. Size: $750 million | Outcome: Won
X
SR 400 Express Lanes
SR 400 Express Lanes
HIGHWAYS
All
2021
WIN/ RATIO's three-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, on this project to design, build, finance and maintain express lanes on a state highway in Atlanta, Georgia.
X
Flood Diversion Channel
Flood Diversion Channel
CLIMATE
All
2019
WIN / RATIO's five-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, on a bid to design, build, finance, and operate and maintain a 30-mile stormwater diversion channel to control flooding in Fargo, North Dakota. Size: $3 billion | Outcome: Won
X
GO Rail - On Corridor Works
GO Rail - On Corridor Works
RAIL
All
2021
WIN / RATIO's nine-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, on this mega-bid to upgrade GO Rail's track, civil infrastructure, signalling, and electrification infrastructure, provide electric vehicles, and operate and maintain the network.
X
Inglewood Transit Connector
Inglewood Transit Connector
TRANSIT
All
2022
WIN / RATIO's six-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, on this bid to design and build a metro line in Greater Los Angeles.
X
Eglinton Crosstown West Tunnel
Eglinton Crosstown West Tunnel
TRANSIT
All
2022
WIN / RATIO's seven-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, on a bid to design, build, and finance the advance tunnel for the extension of the Eglinton-Crosstown light rail line. Size: $255 million | Outcome: Won
X
Ontario Line – South Tunnel and Stations
Ontario Line – South Tunnel and Stations
TRANSIT
All
2022
WIN / RATIO's seven-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, on this bid to design, build, and finance the advance south tunnel and stations for Toronto's Ontario Line subway. Size: $5.5 billion
X
Public Schools Package
Public Schools Package
BUILDINGS
All
2023
WIN / RATIO's six-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, proofreading, and production, for this bid to design, build, finance, and maintain a package of public schools for Prince George’s County, Maryland.
X
Alto High Speed Rail
Alto High Speed Rail
RAIL
All
2024
WIN / RATIO's 13-person team provided end-to-end proposal management, including section management, substantive editing, graphic design, strategic reviews, proofreading, and production, on this major bid to design, build, finance, operate and maintain high speed rail in Canada from Toronto to Québec City. Size: $3.9 billion for the CDA phase | Outcome: Won
X
Baylor U CUP
Baylor U CUP
BUILDINGS
All
2025
WIN / RATIO performed this short engagement to improve a consortium's submission to Baylor University to replace its energy complex. In two weeks, WIN / RATIO redeveloped the templates, gathered additional information from partners, conducted interviews, advised the client on the presentation of information to maximize points, and provided graphic and document design.
X
Copper Cliff Mine Pit RFP
Copper Cliff Mine Pit RFP
BUILDINGS
All
2023
WIN / RATIO supported a Canadian contractor's submission to perform a feasibility study and subsequent development of the Copper Cliff Mine for Vale Canada. Size: $945 million | Outcome: Successful
X
Dartmouth College RFQ
Dartmouth College RFQ
ENERGY
All
2019
WIN / RATIO supported a consortium in its qualification submission to design, build, finance, and maintain a new central utility plant at Dartmouth College. Outcome: Qualified
X
Dundas Bus Rapid Transit
Dundas Bus Rapid Transit
TRANSIT
All
2023
WIN / RATIO supported a consortium on its request for qualification submission for this project to design and build 48 km of frequent bus rapid transit infrastructure in Ontario. Size: $580 million | Outcome: Qualified
X
Fraser River Tunnel
Fraser River Tunnel
BRIDGES
All
2025
WIN / RATIO supported a consortium's request for qualification submission for this project to design and build, via a design and early works agreement (DEWA), a highway tunnel to replace the aging Massey Tunnel in British Columbia. WIN / RATIO provided proposal management, section management, substantive editing, graphic design, strategic reviews, proofreading, and production. Outcome: Qualified
X
Georgia SR 400
Georgia SR 400
HIGHWAYS
All
2020
WIN / RATIO supported a consortium at the qualification and proposal stage for this project to add tolled express lanes and bus rapid transit to the SR 400 highway in Atlanta, Georgia. WIN / RATIO provided end-to-end proposal management, including section management, substantive editing, graphic design, strategic reviews, proofreading, and production.
X
Hamilton LRT Qualification
Hamilton LRT Qualification
TRANSIT
All
2017
WIN / RATIO led this RFQ submission for a consortium pursuing Hamilton Ontario's light rail design-build-finance-operate-maintain project, which was subsequently cancelled. In just six weeks, two WIN / RATIO team members worked with the six-company consortium, plus design consultants, to produce a high-scoring document. Outcome: Qualified
X
Henry Ford Health RFQ
Henry Ford Health RFQ
ENERGY
All
2023
WIN / RATIO supported a consortium in its qualification submission to finance and construct a new central utility plant within Henry Ford Health's expanded Detroit South Campus.
X
Houston Airport APM
Houston Airport APM
BUILDINGS
All
2022
WIN / RATIO provided end-to-end proposal management, including section management, substantive editing, graphic design, strategic reviews, proofreading, production, and interview support on this qualification submission for a new automated people mover at George Bush Intercontinental Airport. Outcome: Cancelled
X
1285 E EL RFQ
1285 E EL RFQ
HIGHWAYS
All
2025
WIN / RATIO supported a consortium on its request for qualification submission for this project to design, build, finance, operate, and maintain express lanes along the I-285 highway in Atlanta, Georgia. WIN / RATIO provided proposal management, section management, substantive editing, graphic design, strategic reviews, proofreading, and production. Outcome: Qualified
X
MISO Qualification
MISO Qualification
ENERGY
All
2025
WIN / RATIO was retained by an international contractor to support its submission to gain access to the US electric transmission system market. WIN / RATIO assisted the contractor in gathering and organizing the requisite administrative and financial information, data on historical contracts, and existing procedural and technical documentation to demonstrate its qualification to bid in the US. Size: Access to pursuits collectively valued at $21.3 billion | Outcome: Qualified to bid in the US MISO region
X
Deep Geological Repository
Deep Geological Repository
BUILDINGS
All
2024
WIN / RATIO provided end-to-end proposal management, including section management, substantive editing, graphic design, strategic reviews, proofreading, and production, on this pursuit to design and build a deep geological repository (DGR) for long-term disposal of radioactive waste.
X
OttawaU Student Residence Development
OttawaU Student Residence Development
BUILDINGS
All
2025
WIN / RATIO provided a six-person team to deliver end-to-end proposal management, including section management, substantive editing, graphic design, strategic reviews, proofreading, and production, on this bid to design, construct, finance, and maintain housing facilities for the University of Ottawa.
X
Highway Maintenance, ALTA
Highway Maintenance, ALTA
HIGHWAYS
All
2025
WIN / RATIO has provided ongoing support to a highway maintenance contractor looking to expand its presence in Alberta, Canada. Working directly with the executive leadership group as well as subject matter experts in British Columbia and Alberta, WIN / RATIO wrote and edited content, provided graphic design, and developed strategies to maximize points. Through this close partnership, the highway maintenance contractor has secured four new contracts in Alberta worth hundreds of millions of dollars.
X
Highway Maintenance, BC
Highway Maintenance, BC
HIGHWAYS
All
2022
WIN / RATIO has provided ongoing support to a highway maintenance contractor looking to secure its existing highway maintenance contracts and expand its presence in British Columbia, Canada. WIN / RATIO worked directly with the executive leadership group as well as subject matter experts to write and edit content, create graphics, and develop strategies to maximize points. Through this close partnership, the highway maintenance contractor retained two historic contracts and secured two new contracts worth hundreds of millions of dollars.
X
HWY Electrical Maintenance
HWY Electrical Maintenance
HIGHWAYS
All
2019
WIN / RATIO supported an electrical contractor to secure a large contract to maintain highway infrastructure—including signals, lighting, cameras, and overhead signage—in British Columbia. WIN / RATIO worked with the general manager, administrative staff, and electricians to develop an overall strategy for the submission and to perform technical writing and editing, graphic design, and document production. Outcome: Won
X
HWY Electrical Maintenance
HWY Electrical Maintenance
HIGHWAYS
All
2021
WIN / RATIO supported an electrical contractor to secure two contracts to maintain highway infrastructure—including signals, lighting, cameras, and overhead signage—in British Columbia. WIN / RATIO worked with the contractor's subject matter experts to develop an overall strategy for the submission and to perform technical writing and editing, graphic design, and document production. Outcome: Won both contracts
X
Municipal Electrical Maintenance
Municipal Electrical Maintenance
All
2022
WIN / RATIO supported an electrical contractor to secure a municipal contract to maintain roadway electrical infrastructure, including signals, lighting, and cameras. WIN / RATIO worked with the contractor's subject matter experts to develop an overall strategy for the submission and to perform technical writing and editing, graphic design, and document production. Outcome: Won
X
Revenue Vehicle Options Analysis
Revenue Vehicle Options Analysis
TRANSIT
All
2017
WIN / RATIO was hired to provide technical writing and editing to support a multi-disciplinary team tasked with analyzing the impact of purchasing a different light rail vehicle on the ongoing Eglinton Crosstown LRT project.
X
U of Iowa Utility System O&M
U of Iowa Utility System O&M
ENERGY
All
2017
WIN / RATIO supported a consortium's request for qualification submission to operate and maintain the University of Iowa's campus utilities system. Outcome: Qualified
X